Menu
Engineering
Urban planning project in Scandinavia:
Insertion of 4-6m long steel bolts in holes with 36-38 mm diameter and filling the holes with cement. The urban project foresees several tunnels, expressways and bridges, which must be fixed accordingly. A mobile m-tec unit that can be attached to the special vehicles was developed in cooperation with the client:
- Silo with modern machinery of m-tec silo mixing pump EMP with requested performance and remote control.
- Stainless steel construction, designed for use in the tunnel.
The developed system allows insertion of steel anchor in half of the time with less physical exertion of the staff.
Have questions, or need more information?
We are glad to help you. Tel.: +49 7631 709 178